Do you need a permit for a furnace or AC in London, Ontario?
What paperwork applies to furnace, air conditioner and gas line work.
Reviewed by Abdullah Ghzail, licensed gas technician•Last checked November 2026
Quick answer: Replacing a furnace or air conditioner in London, Ontario normally does not need a City building permit when it is a like-for-like replacement. Gas work must be done by a TSSA-registered contractor, and new electrical circuits must be done under an Electrical Safety Authority notification. New ductwork systems and new builds do need permits.
Who regulates what
| Work | Regulator | Who looks after it |
|---|---|---|
| Gas piping and gas appliances | TSSA | Your gas contractor |
| New or changed electrical circuits | Electrical Safety Authority (ESA) | A licensed electrical contractor |
| New heating systems in new construction, additions, major duct changes | City of London Building Division | The builder or contractor, by permit |
| Refrigerant handling | Ontario refrigerant rules (ODP certification) | Your AC contractor |
Typical jobs
| Job | City building permit? |
|---|---|
| Replace a furnace in the same place | Normally no |
| Replace or add central air on existing ducts | Normally no |
| Add a ductless heat pump | Normally no; electrical notification applies |
| New gas line to a stove or BBQ | No City permit; TSSA-registered contractor required |
| Heating and ducts for an addition or a finished basement | Yes, as part of the building permit |
| Wood stove or new chimney | Yes |
Rules can change and special cases exist. Confirm with the City of London Building Division before work that changes the building.
Condos and townhouse corporations
Check with the corporation before adding an outdoor unit or making wall penetrations.
Ask your contractor
- Who handles the gas and electrical paperwork?
- Is the price different if a permit is needed?
- Will I get copies?
Common questions
Do I need a permit to replace my furnace in London, Ontario?
Normally no City building permit is needed for a like-for-like replacement. The gas work must be done by a TSSA-registered contractor.
Do I need a permit to install central air in Ontario?
Usually not for adding or replacing AC on existing ducts. Any new electrical circuit must be done under ESA rules.
Who do I call about building permits in London?
The City of London Building Division.